Monday, July 22, 2013
DAY 1, Jobsite 2
Since there are so many of us we have to separate jobsites we are working on. We have to shuttle in all our tools and all of us because the bus can't get down the road to the site. It takes a while for us to get everything in and set up, but it really went pretty smoothly. Half of us are working at a home where we are building a set of stairs
outside from the upper level to the basement. We will be enclosing the
staircase so they can get to the basement in the winter without going
outside. We are also insulating, a sheeting the interior walls of the
basement. We got a lot accomplished at that site today. We were able
to build the upper and lower landings for the stairs. We got the
stringers for the stairs done as well. Inside the basement we finished
insulating the walls and began sheeting them.